Master worksite facilities are energy and cost-efficient, durable, long-lasting and easy to move. The Finnish Master worksite facilities have been developed in cooperation with leading companies in the construction field. Special requirements, energy efficiency and the demanding weather conditions in the Nordic countries related to the transport, installation and use of worksite facilities have been taken into account in design and manufacture. The Master worksite facilities comply with the SFS-5129 standards. The facilities fulfil the requirements regarding the sizing applied to the manufacture of individual spatial elements used as staff facilities of construction sites.
Worksite facilities are moved many times during the course of their lifecycle, which sets special strength requirements for their frames. Due to our unique production technology, the frames, textures and polyurethane insulators of Master worksite facilities form a very strong uniform structure.
The Master worksite facilities insulated with polyurethane consume noticeable less heating energy than traditional worksite facilities insulated with mineral wool, offering superior insulation qualities and durability.
A more energy-efficient Eco collection has been developed and designed alongside the Master worksite facilities regular collection. The polyurethane insulation of the under floors and top floors and walls of the MasterEco worksite facilities is 50% thicker than in standard Master worksite facilities. The MasterEco worksite facility consumes 30% less heating energy than the regular collection and more than 50% less than the traditional wool-insulated worksite facilities. Due to their structure, the worksite facilities of the MasterEco collection can be installed even on three floors without special support structures, and they withstand movement well.